QOLSYS IQ PANEL Manual de instalación Pagina 81

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 91
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 80
TROUBLESHOOTING
MOVING THE PANEL
QOLSYS CONFIDENTIAL AND PROPRIETARY
PAGE OF !81 91
© 1/15/14 ALL RIGHTS RESERVED
If, for ANY reason, you need to move the panel, be sure you have enough battery life to
keep the panel running while not connected to A/C power. If you do not, you must shut
down the panel’s operating system before disconnecting the power supply.
!
1.Select “Settings” from the home screen
2.Enter the installer or master code.
3.Select “Power Down
4.Wait for panel LEDs to turn off
5.Disconnect the power
FIND IT
Settings
?
QUESTIONS? Contact us at [email protected]
SUPPORT
Power
Down
IMPORTANT: Failure to perform these
steps in the proper sequence may result in
data corruption and/or panel failure.
Installer Code Access
Master Code Access
Vista de pagina 80
1 2 ... 76 77 78 79 80 81 82 83 84 85 86 ... 90 91

Comentarios a estos manuales

Sin comentarios